Network route planning
Drain routes mapped against the site plan and building layout

Capital
Sewer network installation in Abdullah Al-Salem starts by mapping the building plan and the pipe route from every fixture to the boundary chamber. We lay drainage pipes beneath the yard and foundation, ensure steady falls and tight joints throughout, then test before backfilling.
Abdullah Al-Salem villas are mostly multi-storey homes with wide yards and bathrooms on different floors, so the drainage network is complex, collecting from upstairs bathrooms, ground bathrooms and annexes. We check each floor trap level and set the main drainage line with a steady fall from the highest fixture to the boundary chamber near the street. Where a floor trap sits too high above the main line, we install a small sump beneath it to gather waste before pumping it into the network.
Abdullah Al-Salem sits in Kuwait city near the British Embassy, a modern villa neighbourhood that needs drainage networks buried deep enough to avoid damage from yard work.
The network is tested by filling the pipes with water and measuring discharge rate before backfilling to ensure no water sits at any point.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
At least one metre to avoid damage from foundation work or vehicles. In tight yards we may dig deeper to avoid clashing with existing footings.
Yes, but it requires new excavation and backfill, and may affect tiles, lawn or nearby foundations. Good planning from the start avoids rework later.
