Network route planning
Drain routes mapped against the site plan and building layout

Farwaniya
Sewer network installation in Hassawi starts with surveying the site, measuring ground levels and distances from fixtures to the boundary chamber. We run drain lines from kitchen, bathroom and laundry under steady fall, then test each section with water before backfilling.
Hassawi older homes have detached kitchens and bathrooms scattered across rear yards, meaning longer drain runs and more complex falls. We check soil depth and hardness before digging, as rock layers need specialist excavators and add cost. Each outlet connects to one main line flowing toward the boundary chamber near Hassawi Co-op, with level checks at every turn.
Hassawi lies in Farwaniya governorate, an older residential district where sprawling plots and scattered fixtures demand extended drain networks.
Each line is filled with water and flow rate watched for minutes before closing each section because sluggish water shows inadequate fall.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually at least one metre deep to avoid tree roots and light digging. In Hassawi we check for rock first because deep excavation becomes costly if stone starts near the surface.
If the paving is sound we cut narrow channels beneath it and relay after backfilling. But old paving may collapse when cut, so we suggest fresh trenches beside it and rerouting the line instead.