Network route planning
Drain routes mapped against the site plan and building layout

Capital
The sewer network in Jaber Al-Ahmad City is planned before concrete foundations are poured, with pipe routes marked from all bathrooms and kitchens to the boundary chamber. We lay drainage lines with even fall and test each joint before concrete and backfill cover them.
Jaber Al-Ahmad City is a new residential development of flats and townhouses where many buildings have multi-storey drainage from ground bathrooms, first-floor bathrooms and kitchens. We draw the full drainage plan on drawings before excavation to prevent pipes crossing water or power lines. Steady falls are critical here because the ground is nearly flat, so we choose the shortest route to the boundary chamber to cut digging depth.
Jaber Al-Ahmad City is a new residential development in Kuwait city where all underground networks are laid in coordination before above-ground building starts.
Compressed air is pumped through all pipes to check for manufacturing blockages before property handover.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
A minimum 90 centimetres clearance from the foundation edge is required; if space is tighter we shield the pipe with a metal cover. This prevents soil collapse beside the foundation if drainage water seeps out.
Pipes are filled and water level is monitored for two hours to check for any seepage. If the level holds steady, the network is ready for use and covering.