Network route planning
Drain routes mapped against the site plan and building layout

Capital
Sewer network installation in Qibla starts with a site survey to fix ground level and surrounding buildings. We plan pipe runs from each fixture to the boundary chamber ensuring steady fall throughout. Trenches are dug to correct depth and every branch is tested before backfill. The work ends with accurate documentation of the buried network.
Buildings in Qibla near the commercial area mix older villas with modern apartment blocks, a difference that shapes the drainage layout. Older villas typically have kitchens and bathrooms elevated above garden level, while commercial towers hold multiple floors with numerous fixtures. We calculate the required fall from the highest outlet to the boundary chamber and size the main pipe by the number of storeys and load. Deep trenches in commercial zones need temporary support during excavation to keep the work safe.
Qibla lies near Gulf Road and Seif Palace, a mixed zone of traditional housing and dense commercial centres where drainage planning must account for varied building age and use.
Every section of the network is tested with water at constant pressure before backfill because repairing a buried leak costs far more than the initial test.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure every fixture and the boundary chamber precisely, then calculate the required fall based on pipe diameter and expected load. During excavation we control trench depth with laser levels to ensure steady gradient with no sags or rises.
Yes, but the pipe must be sized for the combined load and slope steadily from the first fixture to the last. We place inspection chambers at every direction change or pipe-size increase for access and future cleaning.