Network route planning
Drain routes mapped against the site plan and building layout

Farwaniya
Sewer network installation in Rabiya starts by mapping pipe routes from every bathroom and kitchen to the boundary chamber on your property. We set the slopes and depths, test each section under water before burial under soil and tiles.
Rabiya villas are detached houses with separate gardens and driveways, meaning the buried sewer network is long and runs under the yard before reaching the boundary chamber. We dig a trench one and a half to two metres deep and lay pipes on a steady fall of roughly one to two percent, placing an inspection point at every direction change or junction of branches. The soil in Rabiya can be hard to break so we use a small digger to speed the work, then test flow under full discharge before backfilling.
Rabiya lies in Farwaniya governorate, a residential villa zone where sewer networks run buried beneath yards from the house to the property boundary.
We test the network by pumping water through each branch and watching flow, because standing water reveals either insufficient fall or blockage.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Trench depth depends on the height of the boundary chamber outlet and the distance from house to boundary. In Rabiya we typically dig one and a half to two metres to ensure a steady fall and protect pipes from surface damage.
We place an inspection point at every sharp direction change and where a main run meets a heavy branch, but short light runs from a bathroom may not need one. We map the route first and explain the point locations before digging.