Network route planning
Drain routes mapped against the site plan and building layout

Ahmadi
The buried sewer network in Sabah Al-Ahmad City follows a unified master plan with set levels and pipe sizes. We follow this plan precisely and verify every connection before issuing a test certificate.
Sabah Al-Ahmad City is a modern planned district of apartment blocks and villas arranged on regular grid streets, with the main sewage network laid beneath streets in large-diameter pipes. Property branches split from this main network at set angles and reach each building in smaller sizes. We follow the city's precise drawings and measure distances from street centerlines, testing each branch run from building to main network. Pumping stations and central chambers follow unified design standards we fully verify.
Sabah Al-Ahmad City lies in Ahmadi governorate, a planned coastal area laid out with precise geometric regularity and unified level setbacks.
Each branch is run at full flow and we record the time taken for water to reach boundary chamber drainage level.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We do not excavate the main street or central network. We connect the property branch to a designated connection point per the city drawings. We open the property from the building to that connection point only and test the branch separately from the public network.
Yes, the city requires larger diameters and shallower falls because volume allows it. Inspection chambers are spaced further apart, and joints test at higher pressure. We apply the city's design specifications exactly in every project.