Network route planning
Drain routes mapped against the site plan and building layout

Hawalli
Buried sewer network in Shaab connects fixtures from houses, apartments and shops to the boundary collection chamber. We control line fall, place cleaning access points at every bend and seal every joint against root intrusion.
Shaab areas near Shaab Park hold mid-rise apartment blocks and some older villas. Each building has several drainage points from bathrooms and kitchens, and vertical lines inside walls slope down beneath foundations. We monitor fall under each building because sediment collects in shallow or level pipes.
Shaab is in Hawalli near the Gulf, a mixed area of apartment blocks and older villas that expanded in phases.
Every line is tested by pumping water at normal pressure, then inspected with a camera to verify soil has not collapsed on pipes.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We need permission from Hawalli Municipality and temporary road closure during excavation. We bury the pipe at least one-and-a-half metres under the road to prevent breakage from traffic.
Yes, we recommend annual inspection to confirm sediment has not built up. An inspector descends through the opening to check pipe and joint condition.
