Camera survey
Internal filming reveals deposits, cracks and displaced joints along every run.

Ahmadi
Sewer network maintenance in Shuaiba Industrial starts with a full camera survey of all pipes from machine shop branches and factory discharge points to the final inspection chamber. We record the condition of every section and identify blockages and dangerous kinks. Industrial networks carry heavy daily loads, so regular inspection prevents shutdown.
Shuaiba Industrial factories near the KIPIC petrochemical complex discharge cooling water and light sludge into shared sewer lines that must stay clear. We run the camera through every pipe from the plant zone to the main inspection chamber and record any metal buildup or fat deposits. Where we spot cracks or offset joints in steel pipes, we assess whether immediate repair is needed or regular watch-and-wait monitoring.
Shuaiba Industrial sits in Ahmadi governorate south of Kuwait City, an industrial processing zone where automated water transfer between facilities is constant.
Camera runs use low water pressure to avoid dislodging sensitive deposits that would quickly block pipes.
Internal filming reveals deposits, cracks and displaced joints along every run.
Water jetting strips hardened grease, silt and scale from the pipe walls.
Before-and-after visual record shows the owner exactly what changed.
Flow channels and chamber walls checked for damage or silt accumulation.
Branch drains from kitchens, bathrooms and floors traced back to the main line.
A recurring programme catches buildup early before it becomes a blockage.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Heavy factories we recommend inspecting at least twice yearly because industrial deposits build faster than residential waste. Every six months we find new sediment that warrants cleaning or closer monitoring.
Not always. We measure the crack length and location, and check groundwater infiltration. If the crack is surface-level and water flow is steady, we recommend re-checking in three months instead of excavating and repairing now.
