Position and height
Basin set at a practical height and checked level before any connection is made.

Farwaniya
Ablution basin installation in Abraq Khitan starts by tracing lateral water lines and floor traps under thick concrete. We position the basin near the existing trap. We run both supply and waste lines together and test under stable pressure before final handover.
Villas in Abraq Khitan are built on rocky ground with deep foundations and thick concrete floors. Floor traps usually sit in the main bathroom and may be deeper than other bathrooms. This means opening the floor needs specialized equipment and may hit sand layers beneath. We use an electric tracer first to map existing pipes and avoid collision. We cut a precise-width channel at a specific depth and run the new pipe parallel to old lines. We fill the channel with cement mortar after installation and testing and level the surface for tiling.
Abraq Khitan lies in Farwaniya governorate away from the sea, a relatively modern villa district with strong floors and original pipework meeting high standards.
We use a digital slope meter to ensure steady gradient on the new waste line under thick concrete.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Completely safe if we avoid existing pipes and cables. We scan the floor first with an electrical tracer and cut a narrow channel away from all existing lines.
Yes, we fill the channel with strong cement mortar after testing the new pipes completely. We level the surface and allow it to set for four hours before tiling.
