Position and height
Basin set at a practical height and checked level before any connection is made.

Ahmadi
In Hadiya our work starts by understanding the bathroom layout and locating existing connections before choosing the basin location. We mount the basin level on a horizontal line and run the waste with natural fall toward the trap. We seal all joints with sealant and fill the basin with water for one hour to test for leaks before delivery.
Hadiya homes are mostly mid-age with relatively deep ground bathrooms and stable drainage pipes under the floor. This usually means we have enough space to run new pipes without affecting existing structures. We check floor level and test the natural fall before setting the final basin height. If the fall is gentle, we use a larger-bore pipe that allows better flow even with a slow slope.
Hadiya sits near Ahmadi Town and is known for quiet residential homes in a safe and clean environment.
Every connection between the basin and drain is tested under direct water pressure for thirty seconds to confirm no leaks.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we fit a stopcock on the supply line just before the basin so you can cut water for maintenance without shutting off the whole bathroom. The valve is fixed under the floor or on the wall depending on available space.
Yes, but there must be horizontal separation from the main drain line between them. We ensure the basin line does not block tank lid access or emergency maintenance.
