Position and height
Basin set at a practical height and checked level before any connection is made.

Ahmadi
Ablution basin installation at Mina Abdullah typically starts with a location near the terminal rest area or port office. We run hot and cold supply from the nearest feed point, connect waste to the port's main network and fully test the system.
Mina Abdullah port buildings sit close to the seashore with large storage halls and open parking areas, served by a central drainage network handling rainwater and seawater. The basin usually sits in a small admin building or staff room where floor traps already exist. We check humidity and salt spray in the air because corrosion can attack brass fittings faster than in other areas.
Mina Abdullah sits in Ahmadi governorate, a coastal zone of loading berths and storage tanks with constant daily worker traffic.
Supply lines in coastal areas are checked for salt seep and moisture every three months under port working standards.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, salt accelerates corrosion on bare steel and brass. We use chrome-plated or stainless fittings, and advise washing external parts with fresh water weekly.
We check it first with a plumbing rod and test water flow through it. If blocked we clear it before connecting the basin; if at the wrong depth we run waste to the next nearest trap.
