Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Ahmadi
Wall-hung toilet installation in Dhaher requires checking the concrete wall strength in a desert house exposed to strong winds. We bolt the frame deep with long anchors and run lines from the roof tank, then test both fixture and pressure before use.
Desert houses in Dhaher are mostly cast-concrete poured in situ, which holds wall-hung bolts well if there are no cracks near the anchor points. The roof tank supplies water, so we draw the line from there through a protected exterior wall, and waste goes to the yard pit. Every joint is pressure-tested because desert heat can weaken connections.
Dhaher is in Ahmadi governorate near the Saudi border, a desert zone where waste pipes need protection from thermal expansion.
Joint connections are tested at pressure above normal supply because high desert temperatures affect material stiffness.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We do not bolt through a crack, but inspect the wall around the proposed spot and choose a solid section instead, or patch the crack with strong cement mortar before bolting.
Yes, metal pipes in desert heat expand significantly, so we wrap them with foam or cloth insulation to reduce pressure stress and heat loss to the air.
