Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Capital
Wall-hung toilet installation in NW Sulaibikhat begins by inspecting walls in the modern family home. We select a spot away from structural supports, firmly anchor the frame, route connections and cistern, then measure pressure to verify complete safety.
Family homes in NW Sulaibikhat are modern with open designs requiring efficient bathroom spaces. Internal walls may be lighter than load-bearing concrete, so we probe them deeply before choosing an anchor point. If the bathroom wall is thin we fit a reinforcement plate behind the frame to spread the load evenly. Supply lines cross the external wall and waste drops steadily toward the building's vertical duct.
North-West Sulaibikhat sits in Kuwait governorate and contains modern residential family homes with advanced architectural designs.
After frame installation we run water through the cistern and pan together to inspect every joint for dampness or drips.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the wall is thinner than 15 centimetres we install a steel backing plate behind the frame to spread user load. This prevents plaster cracks and extends the anchor lifespan.
Usually three to four hours from inspection to final pressure test. This includes drilling fixings, running pipes, fitting the cistern and running the complete pressure check.
