Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Capital
A wall-hung toilet in Shamiya starts with assessing the old wall in a typical residential brick and concrete house. We secure the frame, run supply and waste lines, fit the cistern, then run full pressure test before completion.
Shamiya houses built by the first generation have hollow clay block walls with a concrete backing. When fitting a wall-hung toilet, we avoid the voids by drilling deep to reach solid concrete. Water and waste lines run inside the wall between the frame and new tiles, requiring precise measurement to avoid extra openings.
Shamiya sits near the Fifth Ring Road in Kuwait City, an older residential area where small bathrooms benefit from a wall-hung toilet to save floor space.
Before finishing, we fill the cistern and listen for leaks behind the wall cavity during water drainage.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes but only if solid concrete lies behind the brick. We drill carefully and test for solidity before anchoring, and if concrete is absent we mount a steel frame resting on the tile floor instead.
No, we cut small openings only for supply and waste line runs, but we do remove tiles around the new frame at least 15 cm deep so it anchors correctly.
