Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Capital
Wall-hung toilet installation in Watiya accounts for old house foundations and varying wall thickness in residential buildings. We test the wall first, then firmly anchor the frame, run pipes and test for leaks before leaving.
In residential Watiya houses near the old city walls, walls vary in thickness and material due to historical expansion. Some walls are modern concrete and others mix brick and stone. We inspect the wall by tapping and measuring and choose anchor points on the strongest concrete parts. Pipes run through the wall cavity at steady angle until they reach the floor trap or main drain.
Watiya is a residential district in Kuwait governorate marked by family houses near remnants of old walls and fortifications.
We tap the wall to determine actual thickness and density before choosing safe anchor points for the frame.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We inspect the wall by tapping and measuring first to determine thickness and material. If concrete is strong and thirty centimetres or more thick, the frame is completely safe. If the wall is weaker we add concrete backing behind the tiles.
We inspect the existing drain line before connection and support it if needed. If the leak is significant we recommend replacing the damaged section before connecting the new frame.
