Acoustic detection
Pinpoints the leak behind tiles before any tile is touched

Capital
Stopping a pipe leak in Nahda starts by checking tall residential towers where vertical pipes run through multiple floors. We install pressure gauges on each floor to verify where pressure suddenly drops. We gradually increase water flow and listen for unusual pipe sounds to identify the worn joint.
Nahda has tall towers with vertical pipes running from roof to ground floor, each storey having multiple units sharing the same main column. A leak at a joint inside the column affects residents across several floors at once. We start from the roof and inspect every joint according to the original design record, then empty the line and disconnect surrounding pipes before cutting. Repair in a tall tower needs coordination with building management to shut off water to affected units without cutting the whole tower.
Nahda sits in Kuwait governorate at the Fourth Ring Road junction, an area of tall residential towers with high occupancy density.
Before refilling the line, new joints are tested by pumping water at one point seven bar pressure for five minutes with zero leakage.
Pinpoints the leak behind tiles before any tile is touched
Films the pipe interior before and after repair work
Damaged section replaced with heat-fused pressure-rated pipe
Corroded galvanised iron replaced before internal rust causes burst
Confirms the repaired line holds before wall is closed up
Repairs leaks on roof-level supply pipes exposed to heat
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, we agree with building management to close a stopcock on just the highest affected floor, allowing lower floors to retain water. This minimizes disruption but takes longer for diagnosis and repair.
If the joint is accessible at the ground-floor manifold, we need two hours. If it is deep inside concrete, we may need four hours or more for cutting, repair and testing.
