Acoustic detection
Pinpoints the leak behind tiles before any tile is touched

Ahmadi
Stopping pipe leaks in Shuaiba Industrial demands understanding the complex layout of lines in heavy plants. We locate leaks using acoustic and pressure detection, then isolate the section and repair it without halting critical operations. Time is critical here, and accurate diagnosis saves expense.
The petrochemical plants and heavy facilities around Shuaiba depend on buried pipe networks running under asphalt between high-pressure buildings. When water leaks from these main lines, locating the leak before digging saves days of shutdown. We use acoustic detection to trace the pipe underground, then measure pressure at each test point to pinpoint the hole. After isolation and repair, we backfill the trench and re-pressure-test the whole section.
Shuaiba Industrial sits in Ahmadi governorate and houses the KIPIC petrochemical complex and several refineries, where water networks demand continuous maintenance.
Every weld joint after repair is tested under pressure exceeding normal operating pressure to ensure the leak does not return.
Pinpoints the leak behind tiles before any tile is touched
Films the pipe interior before and after repair work
Damaged section replaced with heat-fused pressure-rated pipe
Corroded galvanised iron replaced before internal rust causes burst
Confirms the repaired line holds before wall is closed up
Repairs leaks on roof-level supply pipes exposed to heat
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use acoustic detection equipment that hears water noise from the pressurized pipe, then check pressure at known test points to narrow the exact spot. This cuts road cutting to roughly one meter only.
Yes, by isolating the leaking section from the rest of the network, then opening the pipe from the side rather than full cutting. Pressure is restored gradually after repair to ensure no new joint failure.
