Acoustic detection
Pinpoints the leak behind tiles before any tile is touched

Jahra
Stopping pipe leaks in Sulaibiya Industrial starts by understanding the complex distribution system serving multiple factories from one central pump station. We pressure test from multiple distribution points to isolate which section has the leak. Then we open the trench or wall and replace the damaged section with calibrated pipes.
Factories in Sulaibiya Industrial are connected by an underground pipe network stretching hundreds of metres from the pump station. This network faces ground movement and localised subsidence, especially in hot summer. Pipes compress or expand unevenly at support points. When a pipe leaks we walk the entire suspect line before digging and use a device that sends sonic signals through the pipe to pinpoint location exactly. We trench deep enough and open only around the leak point, not the whole run.
Sulaibiya Industrial sits in Jahra governorate, a zone of medium and large factories with complex shared service systems.
We measure underground support points every 10 metres because subsidence of even 2 centimetres is enough to stress unsupported pipes.
Pinpoints the leak behind tiles before any tile is touched
Films the pipe interior before and after repair work
Damaged section replaced with heat-fused pressure-rated pipe
Corroded galvanised iron replaced before internal rust causes burst
Confirms the repaired line holds before wall is closed up
Repairs leaks on roof-level supply pipes exposed to heat
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No. The network is divided into sections with isolation valves at each distribution point. We close the valve for only the affected factory. Other factories keep service throughout repair. It may take one or two hours depending on valve access ease.
Yes, but with greater difficulty. We dig to the required depth and carefully expose the pipe without weakening the foundation. We may need engineering support if the hole is very close to the concrete base. Work takes one to two days.
