Pre-work survey
Camera run before any intervention to locate the exact fault point

Capital
CCTV inspection in Qadisiya exposes the real condition of drain lines beneath villas and streets near Kuwait SC stadium. We feed the camera from the first inspection chamber and record every pipe section to the main connection. The video shows blockages, silt, roots, fractures and leaks. The report tells you line status and any urgent repairs needed.
Qadisiya is a mid-size villa district built in the 1970s and 1980s. Most villas have small to medium gardens. Drain lines run under villa slabs and side passages. The area near Kuwait SC stadium sees heavier vehicle traffic. Constant vibration causes gradual subsidence in drain sections. Older houses may have clay or cement pipe up to 40 years old. The camera precisely shows where cracks began and whether they threaten the line. Inspection every two years prevents sudden collapse.
Qadisiya sits in Kuwait City near Qadisiya Co-op and Kuwait SC stadium, an older villa district with drain lines of varied age.
We test video quality at the first chamber because old pipes may be narrow and encrusted with heavy sediment buildup.
Camera run before any intervention to locate the exact fault point
Second camera pass after clearing confirms the line is clean and open
Camera reveals pipe cracks and joint displacement caused by ground movement or roots
Internal leak points identified before any decision to break and repair
Camera survey of lines entering and leaving inspection chambers and cesspits
Survey of restaurant and commercial lines where grease and deposits build up
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Small cracks may remain stable for years if they do not expand. We compare the footage with any prior inspection and recommend rechecking annually or every two years. If cracks begin widening, immediate replacement becomes necessary.
The camera typically shows the line has sagged slightly from soil subsidence under vibration. Minor sag slows flow and causes sediment pooling. Significant subsidence may require line relaying or replacing the collapsed section.
