Pre-work survey
Camera run before any intervention to locate the exact fault point

Ahmadi
CCTV inspection at Wafra reveals agricultural drain blockages and root penetration damaging pipes beneath crop fields and greenhouses. We enter from the last access well on the main line and push the camera against flow to the first pickup point. The video shows which roots need chemical removal or excavation repair.
Wafra farms rely on extensive underground drain networks to shed excess irrigation water, and tree and palm roots seek moisture and penetrate small cracks in pipes. Pipes buried a metre and a half below surface also suffer pressure from heavy farm machinery, causing compression and displacement. The camera clearly films root masses and measures how much of the pipe is blocked and which sections are too weak to hold under pressure.
Wafra sits in Ahmadi governorate near the Saudi border and is a farming community that depends on reliable drainage networks to protect crops.
We test water flow strength after filming every 200 metres because roots grow rapidly at Wafra and can seal the line very quickly.
Camera run before any intervention to locate the exact fault point
Second camera pass after clearing confirms the line is clean and open
Camera reveals pipe cracks and joint displacement caused by ground movement or roots
Internal leak points identified before any decision to break and repair
Camera survey of lines entering and leaving inspection chambers and cesspits
Survey of restaurant and commercial lines where grease and deposits build up
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, the camera only films and records. We use a separate cutting head once we know exactly where roots begin and end. We send a rotating head or high-pressure jet to clear roots then inspect the spot again with the camera.
Heavy tractors and harvesters press soil from above with forces reaching ten tonnes per wheel. This pressure transfers deep and compresses concrete pipes from the sides, flattening or cracking them. The camera shows fine cracks and oval compression marks inside where machines pressured the soil.
