Walls and base coating
Full internal surface treated including the pit base

Farwaniya
Sealing a warehouse pit in Ardhiya requires complete emptying then careful inspection of every crack across the floor and walls. We treat each fissure and weak area with waterproof sealant, then camera-check the pit.
Warehouses in Ardhiya are water-heavy because cleaning and cooling operations generate steady discharge year-round. Older pits in these warehouses suffer concrete degradation from constant dampness and light chemical exposure. Our inspection starts by measuring pit depth and mapping cracks on walls and floor. We empty the pit fully using powerful vacuum extraction, then scrub the interior with stiff brushes to remove deposits. We then apply the first coat of waterproof sealant to all walls and floor, allow it to cure, and add a second coat for complete protection.
Ardhiya Warehouses district in Farwaniya sprawls along both sides of the Fourth Ring Road, where storage and distribution operations concentrate.
We test the sealant by spraying the treated surface under high pressure to confirm zero seepage.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, because we schedule work during non-operational hours or weekends. Treatment takes one day for emptying, cleaning and the first coat application.
An old pit needs deep cleaning and sediment removal before sealing, while a new pit is sealed immediately after concrete curing. Both methods achieve the same leakage protection level.
