Walls and base coating
Full internal surface treated including the pit base

Farwaniya
Cesspit waterproofing in Ishbiliya serves larger pits beneath yards in family homes with extended households. We open the cover, use video camera inspection, seal cracks and joints, then close it.
Ishbiliya houses usually have a wide yard and a large pit for bigger households. The structure is stone or block with a concrete base cracked from alternating dry and wet seasons. Seepage starts at joints between pit rings, and each joint needs separate treatment. We use high-resolution camera to locate every weak point, then apply flexible sealant tape over the ring junctions.
Ishbiliya lies in Farwaniya governorate, a residential district where larger family homes and spacious yards cluster together.
Each pit ring joint is inspected by camera then tested under steady water pressure for half an hour before moving to the next.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we apply a first layer of flexible sealant to every joint, then after one day add a second layer for full seal assurance. We test under water pressure before signing off.
It must be pumped out and cleaned with high-pressure water first, because sediment prevents sealant bond. Only after complete drying do we start sealing and testing.
