Walls and base coating
Full internal surface treated including the pit base

Farwaniya
Rabiya pit waterproofing starts by removing the cover and pumping all pit contents into a specialized truck tank. We inspect the walls, floor and concrete collar for cracks, apply sealant and verify with camera.
Old Rabiya residential houses have deep pits built by traditional methods that may not provide tight waterproofing. Seasonal moisture and seepage from pit walls cause foundation and exterior wall problems in neighbouring homes. Our inspection includes measuring pit depth from ground level and assessing concrete condition visually and by touch. We look for soft spots or eroded areas where water slowly penetrates walls. After full pit emptying we clean walls with low-pressure water spray to remove algae without surface damage. We apply liquid sealant that penetrates pores and cures into a solid protective layer, then add a second coat for additional strength.
Rabiya is an older residential district in Farwaniya governorate, where most homes rely on cesspit drainage due to the absence of public sewerage.
We measure seepage rate before treatment by filling the pit with water and monitoring level drop over six hours.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The pit is for sewage drainage only, not rainwater absorption. Surface rainwater channels are completely separate and will not be affected by pit sealing.
The process typically takes 6 to 8 hours: two hours for pumping and cleaning, two for the first coat, two for the second coat and verification.
