Walls and base coating
Full internal surface treated including the pit base

Hawalli
Sealing a Salwa cesspit starts with checking the pit walls and base for cracks and seepage. We apply waterproof coating to the entire inner surface, seal all openings and raise the top collar. Before the cover goes back, we camera-verify the work.
Salwa houses near Salwa Co-op typically have older pits with stone and bare concrete walls. The soil here is sandy and drains fast, so we treat the base first then work up the walls. We test the first waterproof coat before applying the second to prevent groundwater seeping in.
Salwa sits in Hawalli governorate near Mishref Park, an older residential district relying on individual cesspits.
The sealed pit is recorded with a power-point camera before closing because the work stays underground.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on pit depth and wall condition, but most Salwa pits take one day. We start with inspection and cleaning, then apply the waterproof coating in stages.
Yes, a full pit hides the walls and cracks. We arrange emptying or pump out before starting the waterproof treatment.
