Walls and base coating
Full internal surface treated including the pit base

Capital
Cesspit waterproofing in Shuwaikh starts with a camera inspection of walls and base to find any cracks or seepage. We apply a moisture barrier coating across all interior surfaces, then pressure-test the seal before replacing the cover.
Shuwaikh houses near port facilities have fast-draining sandy soil saturated with salt, so cesspits here corrode faster than inland. Concrete walls crack from salt attack and high moisture, and waste seeps through hairline fractures into the water table. We scrape walls clean, remove deposits and apply a salt-resistant epoxy coating that lasts years, then pressure-test every joint before handover.
Shuwaikh is a mixed commercial and residential zone on the capital coast, where Shuwaikh Port and Kuwait Science Museum sit, with cesspits exposed to high groundwater levels.
After coating, we run an 80 millibar air pressure test for 15 minutes to verify the seal holds tight.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, because we use marine-grade epoxy formulated for salt environments. The coating isolates concrete from saline moisture, so walls do not crack after work. We also pressure-test it to ensure full adhesion.
The coating fully cures in 24 hours, but we flood-test it for an hour before the cover goes on. You can use the pit straight after handover with no further waiting period.
