Walls and base coating
Full internal surface treated including the pit base

Jahra
Cesspit waterproofing in Uyoun starts with a drain camera to find leaks and cracks in the pit walls and base. We clear silt buildup, apply two-part sealant coating to the treated surface, seal the collar ring and take final footage before replacing the cover.
Many Uyoun houses have old artesian wells and deep cesspits under the house or front yard, collecting drainage from kitchens, bathrooms and washing machines together. The light sandy soil around Uyoun lets polluted pit water seep into groundwater fast, so wall inspection by camera and strong treatment are vital. We apply acrylic caulk to fine cracks first, then coat walls and base with thick epoxy paint that bonds to damp concrete.
Uyoun lies in Jahra governorate near old natural springs, a residential district of family homes relying on deep cesspits for household drainage treatment.
We sample pit walls before coating to check concrete thickness and chemical erosion from ground salts.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, the coating covers walls and base together. We clear silt first, then lower the brush carefully into the wet mud to ensure an even layer across all surfaces.
It must dry for at least eighteen hours. Epoxy paint needs that time to reach full hardness underground before the pit fills with water and drainage.
