Walls and base coating
Full internal surface treated including the pit base

Ahmadi
Cesspit waterproofing in Zour involves large pits serving massive power generation stations. We inspect base and walls by camera, apply sealant layers across all interior surfaces, allow full curing, then test tightness before handover.
Power and desalination plants in Zour require massive cesspits to handle wastewater from offices, labs and toilets across sprawling facilities. These pits are designed for continuous year-round operation and receive relentless heavy water loads. Concrete walls in these pits face sustained stress, and small cracks grow quickly under pressure. Before treatment we fully empty the pit and run a compressed-air pump to dry the interior surface. Then we inspect with high-definition camera to find every weak point, then apply strong sealant across all walls and base.
Zour lies in Ahmadi governorate, a major industrial zone housing primary power and desalination generation plants.
We test the seal by gradually filling large pits to three-quarters capacity with water for four hours because these pits handle high continuous flow.
Full internal surface treated including the pit base
Cracks and voids filled before any coating is applied
Pit emptied and pressure-washed before waterproofing starts
Internal camera documents wall condition before work and after
Collar and pipe-entry points sealed against infiltration separately
Available around the clock across all 6 Kuwait governorates
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The epoxy we use withstands temperatures up to 60 degrees Celsius without softening or losing seal integrity. Zour subsurface heat does not exceed this threshold for underground applications.
Emptying, inspection, application and curing takes three full days for a large pit. After that we test tightness and document the camera footage before site release.
