Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Ahmadi
A backflow valve installation at Ahmadi Stables begins with a camera survey inside the main drain line to locate slopes and obstructions. We position the valve at the lowest safe point before pipes enter the structure, then test closure and opening under full flow.
The stables and sports facilities around Ahmadi drain livestock and paddock water through lines that are sometimes exposed and shallow, and the valve guards against that water backing up during flooding. We check the full line gradient and measure pressure on both sides of the valve, clearing any sediment before installation since grease and fibres block the flapper quickly. After closure we leave a small vent port open to prevent sudden pressure lock.
Ahmadi sits in Ahmadi governorate and includes equestrian facilities and a well-known racecourse, installations vulnerable to water pooling because of low-lying terrain.
We test the valve opening and closing ten times in sequence because new flapper seals need grease residue cleaned from the factory.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It must sit lower than any expected flood level, usually at least 1.2 metres deep in Ahmadi. We choose the depth after surveying the site and reviewing old drain maps and terrain.
Yes when closed, but it needs cleaning every six months because fibres and solids snag the flapper. We teach the user to spot blockage signs like stronger smell and sluggish flow when it opens.
