Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Jahra
Drain backflow valves in Kabd protect horse stables and farm buildings from sewage backing up after rainfall. We start with a camera survey of the main line that may run a long distance under the farm grounds. We select a location near the building foundation and install a valve of appropriate diameter, then test closure by pumping at known pressure.
Kabd is a desert zone famous for a racing circuit and horse breeding with large farm holdings containing stables and storage buildings. Main sewage lines run long distances between buildings and fields and may be partially exposed. The valve must install near the stable or main building outlet before the line joins the public network. We check the line fall carefully along its length and confirm it remains steady to the valve point. We choose a robust valve resistant to salty sandy soil moisture and test it with water flow before final burial.
Kabd sits in Jahra governorate, a desert area with a camel racing track and extensive farm holdings.
We test the flapper under steady water pressure for five minutes to confirm the valve does not leak when fully closed.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If all buildings connect to a single main line before the public network then yes, one larger valve protects them all. But if each building has a separate line then each line needs its own valve.
We install the valve at the nearest buried point in the soil, even if it is slightly farther from the building. If no buried point exists we dig a small pit, bury the valve, and cap it with sand and a concrete shield to protect it from animals and weather.
