Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Capital
Backflow valve installation in Mirqab starts with camera inspection to find the best point on the main line before floor branches. We open the pit, fit the valve with precise alignment and test closure under full pressure before resealing and refilling.
Mirqab is a dense residential zone with tall towers and apartment blocks, home to a central market and religious site nearby. Main pipes under the street are old and often clogged with grease and debris from many units. Backflow happens especially during peak morning and evening use. The valve sits near the building entrance and stops water coming from the street before it reaches any internal pit.
Mirqab lies near the Central Market and Grand Mosque where residential units are dense, a zone at risk from backflow due to heavy usage.
After installation we flush all toilets and open all taps together and watch the valve to ensure it maintains flow and does not block.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, the valve must sit on the main drain before it enters the building. Indoor fitting protects only some floors, but the outdoor pit protects everything.
If back pressure is too high, the building may need an extra relief pit. We measure pressure during inspection and suggest a solution if needed.
