Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Capital
A backflow valve at Mubarakiya Camps is essential protection because the area is very close to the city's main pump station and pressure fluctuates heavily. We inspect the main outlet by camera, fit the valve in the most accessible spot and run a full pressure test. The valve stops returning water automatically on the first pressure drop.
Camps at Mubarakiya are older, tightly packed buildings with bathrooms and kitchens on every floor, and main lines run under narrow streets before reaching the market. When the municipality cleans the network or an outage occurs, water backs into every building fast. The valve must sit where it can be checked quarterly because high pressure causes sediment buildup.
Mubarakiya Camps sit near the market and ground-level embankment in central Kuwait City, where an old drain network serves high population density.
Before handover, we test the valve at pressure levels matching peak usage in the district to ensure strong closure.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, in a high-pressure area we recommend inspection every three months. We open the valve, clean out sediment and debris that could prevent full closure.
Freezing is rare in Kuwait but if it occurs, water expands and can jam the gate, causing incomplete closure. We position the valve where it is protected from extreme temperature swings.
