Pre-fit camera check
Line condition and diameter confirmed before valve position is chosen

Ahmadi
Backflow valve installation in Sabah Al-Ahmad City begins with a deep camera survey of new construction to map line slope and stations. We select the valve location at the lowest point in the villa or apartment, fit it under high pressure and run a final flow test.
New Sabah Al-Ahmad City comprises planned apartment blocks and urban projects with drains designed for uniform slope from upper floors. We install the valve at the first inspection chamber near the building's main entry, with adequate working space and access. We verify the line has no sharp bends that obstruct the flapper and test it with running water for several minutes.
Sabah Al-Ahmad City is in Ahmadi governorate, a modern planned urban zone with uniform drain lines and designated inspection chambers.
New construction drains are documented in drawings, so we verify the plan first then confirm it with a camera before choosing valve position.
Line condition and diameter confirmed before valve position is chosen
Closest viable point to the public sewer for maximum protection
Valve set into the line without unnecessary tile breaking
Flap mechanism tested in both directions before the line is reconnected
Line filmed again to confirm valve seating and unobstructed flow channel
Correct siting verified relative to cesspit or inspection chamber position
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, the valve is on the drain line only, not the water supply. Cold and hot pressure remains normal, though drainage may be slightly slower depending on valve bore.
We test it immediately before handover and recommend regular inspection every six months once occupied. If you notice unusual drainage slowness, contact us right away.
