Pre-work camera check
Camera inside the pipe locates the exact blockage point before the machine runs

Ahmadi
Clearing a blocked line in Shuaiba relies on a dependable camera to pinpoint blockage location precisely before connecting the heavy-duty grinding machine. We push the cable under controlled pressure until the line opens completely, then test it under full flow to confirm clean drainage.
Shuaiba is an industrial coastal zone south of Ahmadi housing factories, warehouses and workers' accommodation, where main drainage lines receive thousands of tonnes of industrial waste and oils annually. Heavy iron pipes resist pressure but rust internally over years, accumulating salts and minerals. Blockages may come from industrial greases, sand or even small metal fragments accidentally dropped. The camera gives us a clear view of the blockage and pipe wall condition before we select a heavier, more powerful machine head.
Shuaiba sits in Ahmadi governorate as a coastal industrial zone where main lines serve factories and shipping facilities.
The line is tested after grinding under pressure higher than normal flow to verify pipes can handle expected heavy discharge.
Camera inside the pipe locates the exact blockage point before the machine runs
Rotating cutter head breaks the obstruction and drives it through the line
Machine reaches deep blockages in the main sewer line beyond floor-level access
Sand, grease and wipes removed from blocked floor waste outlets
Second camera pass confirms the clear line on screen before the team leaves
Machine clearing for restaurant kitchens, residential complexes and office buildings
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, heavy oils cool and solidify in horizontal pipes especially in winter, trapping sand and other matter. The camera shows thick black coating on pipe walls.
Yes, but we select a heavier, more powerful head for hard metals and monitor pressure to avoid cracking old pipes. Camera footage before and after confirms the result.
