Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Hawalli
Sewer network installation in Hawalli Midan means working between shops, offices and old blocks along the central commercial street. We extend waste lines from each shop and building, gather them under the pavement, then connect to the existing municipal line. Every section is tested under direct flow before the street reopens to traffic.
Shops and offices in Midan are old with cramped foundations, and existing drainage often tangles below the pavement with water and electric lines. Before digging we map existing utilities precisely with detection equipment and coordinate with the municipality, electricity and water authorities. Trenches are narrow and shallow under the pavement, so we use flexible polyethylene pipes that navigate obstacles and minimize concrete pavement breakage.
Hawalli Midan lies in Hawalli governorate in the heart of the old commercial district, where shops and office blocks line the busy strip.
Because existing services are dense and overlapping, we use underground line detection cameras at every point before actual digging to avoid cutting wires and pipes.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We aim to avoid cutting water and electricity by carefully rerouting existing lines around the new sewer path. If necessary, any cut is very brief and temporary, coordinated with the shop owner to occur during limited closed hours.
We use small-bore flexible pipes where possible and open very narrow excavation windows just thirty centimetres wide. This minimizes pavement breakage, and we reset matching concrete immediately after closing the trench.
