Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Jahra
A municipal sewer connection in Abdali ties farms and rural homes to the public network through long lines in geologically varied ground. We locate the network entry, dig a trench with steady fall through different soil layers, and document the live connection on video before handover.
Abdali is a farming area near the Iraqi border with scattered farms and some rural homes where municipal network boundaries are still expanding. Soil changes from fine sand to heavy clay to limestone within the same trench, complicating excavation. The network may sit at irregular depths along the main road, so careful survey is essential before digging. Heavy-wall PVC pipes resist variable soil pressure and limestone that could puncture thin-walled pipe.
Abdali sits in Jahra governorate near the Iraqi border, a traditional farming area where modern municipal networks are gradually expanding.
Every section of the connection line is recorded at GPS height to ensure precise engineering fall across variable terrain.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Heavy clay exerts pressure from all sides, so we use thick-walled pipes and support them with sand beds and foam packing. We also recommend camera inspection every year or two to check for settlement or cracks.
Distance determines excavation time and pipe quantity. A farm 150 metres from the road may take 3 to 4 work days depending on soil difficulty. We calculate distance and required fall before quoting.
