Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Ahmadi
Municipal sewer connection in Bnaidar begins by locating the collection station in this desert zone. We extend your drain from the house to the station at even slope, test with live flow and record clear video.
Bnaidar is an arid desert zone with isolated buildings: small villas, sheds and occasionally warehouses. Gaps between structures are large and the public network is remote from most sites. We start with precise site survey to measure distance and height difference, then excavate a steady-slope trench through sandy soil. The pipe needs protection from intense heat and sand movement, so we fit a protective cover before final backfill.
Bnaidar lies in Ahmadi governorate, a sparsely built zone where desert terrain entirely determines design options.
We record slope readings at short intervals because sandy soil may settle over time after direct excavation.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We bed the pipe on stable sand first, then cover it with a plastic protective layer before backfill. This shields it from expansion and contraction caused by daily heat swings.
We use pipes designed for hot zones to withstand expansion and heat. Before use we test the pipe to confirm it handles local temperatures without warping.
