Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Ahmadi
Municipal sewer connection in Dabaiya starts by pinpointing the government entry point in this southern zone. We connect your pipe from the building to the station with correct fall, test live flow and document it on detailed video.
Dabaiya is a desert zone with scattered buildings: small homes, animal sheds and some stores. The municipal network runs along the main road, away from most structures. We excavate a long trench through sand at steady slope, then lay the right-sized pipe and bed it in flat sand. Before backfill we run water from the building and inspect every joint for leaks in the trench.
Dabaiya sits in southern Ahmadi governorate, an arid zone where long sewer line runs are unavoidable.
We test the full line under natural flow before backfill, because shifting sand may cause settling after completion.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if we choose the right pipe diameter and maintain steady slope. We calculate expected wastewater volume, then select size based on distance and height difference.
We use breaking tools to clear the rocks, then level the base with clean sand. The pipe needs a stable bed with no sharp points.
