Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Ahmadi
A proper municipal sewer connection at Mina Abdullah links drainage lines from terminals and storage facilities to the main grid. We test each section with camera inspection and record the footage before closure and final handover.
The marine terminals and large stores at Mina Abdullah have high drainage loads from floor washing and operations, meaning connection pipes must handle large flow without blockage. We lay bigger-diameter pipe with steady depth and no bumps, and test by raising water from the city grid to confirm drainage returns to the sump. We inspect all pipe joints and the underroad voids where sediment might hide.
Mina Abdullah sits in Ahmadi governorate, a major oil port where drainage lines must meet tough corrosion-resistant standards.
Before handover, we send a small camera inside the line from start to connection end to film any fault or blockage.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if we can isolate one section of the line without cutting current drainage. We fit temporary horizontal bypass pipes to divert flow while we dig and connect, then remove the bypass after full testing.
A proper municipal connection reaches the city treatment plant, not the sea directly. The plant cleans water before discharge, and we ensure a clean connection with no leaks to soil or groundwater.
