Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Mubarak Al-Kabeer
Connecting your home to the municipal sewer in Mubarak Al-Kabeer requires first locating the nearest public entry point beneath the road or surrounding ground. We run the drainage pipe at steady gradient from house to entry, then inspect the connection with live footage before closing the trench.
Mubarak Al-Kabeer is characterized by large family homes surrounded by spacious gardens, often with the municipal sewer set at some distance from the house perimeter. We excavate a trench deep enough to ensure proper pipe fall without deformation, testing each joint as we dig. Where bedrock sits near the house, we may use a power breaker or hand pick to prevent delays.
Mubarak Al-Kabeer lies in Mubarak Al-Kabeer governorate near Messila Beach, comprising separate residential districts connected by a unified sewer system.
After connecting the pipe to the network entry, we run full flow from the house to monitor drainage and confirm no leaks at joints.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Rock increases excavation and breaking time, which may affect schedule. We inspect the ground first and tell you what to expect before we start.
We remove most debris and stack it near the excavation. Backfill uses the soil we dug out unless you request grading to a different level.
