Municipal tie-in
connecting the property drain to the public sewer at the correct entry point

Capital
Municipal sewer connection in Sawaber starts by locating the main line serving dense residential towers. We excavate to pipe depth and test existing capacity. We connect the building line to a new or existing opening and record everything on camera before backfill.
Sawaber is a modern complex with tall residential towers and many units per floor. The main municipal line runs under central roads and must handle high flow from all towers. We check drainage pressure from the complex roof and ensure the new connection does not disrupt flow from other towers.
Al Sawaber Complex sits in Kuwait governorate near Sawaber tower and central residential high-rises, an intensely urban district.
We measure the full complex drainage flow rate before the new connection to ensure the municipal line does not back up.
connecting the property drain to the public sewer at the correct entry point
setting pipe fall so flow is self-cleaning and solids do not settle
installing a chamber at the junction point for future access and cleaning
internal filming of the joined line before backfill, customer views the screen
confirming all joints hold before the excavation is permanently closed
connecting new construction or building extensions to the existing public main
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we need precise calibration of fall and diameter. If tower flow is high we may need a larger-diameter pipe or dedicated collection chamber.
We measure pressure and flow during work and coordinate with Municipality before final connection. We may delay connecting several units or install a temporary pump station.
