Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Mubarak Al-Kabeer
Industrial sewerage network in Sabhan collects outlets from multiple factories and warehouses into the main collector line. We map routes by site layout, run large-diameter pipes and install multiple inspection chambers.
Sabhan factories need complex sewerage because each has multiple discharge points that may require pre-treatment. We route each branch and coordinate with other pipe runs and site roads. Large-diameter pipes of 10 or 12 inches are laid underground at steady fall with inspection chambers every 30 meters for cleaning.
Sabhan Industrial sits in Mubarak Al-Kabeer governorate, a cluster of factories and dry dock requiring robust sewerage and continuous monitoring.
Large pipes are tested at 1500 liters per minute for 20 minutes to ensure all joints withstand pressure.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Sometimes, if the factory floor level is higher than the main sewer line. We size it based on actual height difference and daily discharge volume.
We perform a full ground survey before digging to locate all existing pipes and cables. We adjust the new network route to avoid clashes and record each location on the final map.
