Sewer network installation
Laying internal and external sewer pipes with correct fall and alignment

Capital
Sewer network installation in Sawaber serves tall residential towers and multi-storey complexes in the city centre. We run vertical pipes from each unit to a manifold in the building basement then pump them to the surrounding municipal network.
Sawaber Complex towers contain dozens of units per floor, so we need thick vertical pipes and a grease interceptor before the lift station. Each drain outlet must connect quickly so load does not accumulate on narrow horizontal pipes. We install a cleaning water injector in the basement that allows clearing minor blockages without cutting off drainage from upper units.
Sawaber sits in Kuwait governorate, a dense residential district of close-packed tall towers where street-level sewage networks are saturated with heavy loads.
The lift station contains two standby pumps because one pump stopping for three hours may cause water to back up into upper units.
Laying internal and external sewer pipes with correct fall and alignment
Tying the building network into the public sewer at the designated manhole
Camera survey confirms no offset joints, sags or debris before backfilling
Constructing or placing inspection chambers at correct intervals along the network
Testing joint integrity to confirm no leaks before the trench is covered
Drainage works for villas, commercial buildings, and residential complexes
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use pipes at least one hundred millimetres in diameter and flush the vertical pipe with high-pressure water every three months. The grease interceptor removes most deposits before the lift station inlet.
The standby pump starts automatically when water level rises in the collection chamber. We inspect both pumps monthly by running them together to confirm the automatic switch works properly.
