Network route planning
Drain routes mapped against the site plan and building layout

Capital
Buried sewer networks in Adailiya near Adailiya Co-op and the German Embassy require precise spacing and fall control. We survey the site accurately, execute phased excavation, lay pipes and inspection chambers around existing roads, and fully test before handover.
Adailiya has multi-storey villas, some near Adailiya Co-op and Adailiya Park. The soil is a sand-clay mix with a hard stone bed 1.5 to 2 metres down. Trenches cannot go deeper because the stone bed blocks further excavation, so we select routes with natural fall and raise inspection chambers slightly above the house base level.
Adailiya sits near the German Embassy and Adailiya Park, an upmarket residential zone where modern villas cluster closely together.
Drainage from second-storey floors requires larger-diameter pipes because the stone ceiling prevents adequate fall at traditional burial depth.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We stop and raise the sewer line higher above surface or use larger-diameter pipe to achieve needed fall. Heavy stone may require powered excavation assistance.
Yes, if deep digging is blocked by stone we build the chamber from ground level upward and partially bury it. We cap it with a sturdy cover and balance all pipe levels proportionally.