Network route planning
Drain routes mapped against the site plan and building layout

Ahmadi
A buried sewer network in Dhaher starts from scattered villas in the Ahmadi desert region and needs careful planning to avoid rocks and hard soil. We run pipes from each unit toward the boundary, trench into compacted ground, haul excess earth by truck, and test the route.
Dhaher buildings are sparse and scattered, and desert soil is hard with gravel and small stones compacted together. When we trench for the sewer network we use heavy machinery because sand packed by water over years becomes nearly rock-solid. We trench at steady depth around one and a half metres, break up gravel below the pipe for support, then backfill with compacted soil. Every joint is tested because the pressure during trenching can loosen connections.
Dhaher sits in Ahmadi governorate near the Saudi border, a sparse desert region where buildings are scattered across wide distances.
Compacted soil extracted during trenching is hauled by truck because the excavation volume is large and the ground does not settle naturally.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the villas sit on a consistent slope toward one point. We use larger-diameter pipes for the main line and connect each villa to an intermediate inspection chamber before the main line.
We bed each pipe in fine sand and broken gravel to absorb pressure from surrounding soil. Every section is tested with water and compressed air to find any cracks before final backfilling.