Network route planning
Drain routes mapped against the site plan and building layout

Ahmadi
Sewer network installation in Fahad Al-Ahmad begins by surveying existing foundation and floor levels. We run pipes from every fixture to the boundary chamber, check all falls and seal joints before backfill.
Fahad Al-Ahmad houses sit on individual plots with deep concrete foundations, and the network runs beneath floors near bathroom and kitchen bases. We measure level differences between each fixture and the internal floor trap first, then calculate horizontal and vertical runs so every section falls at least one in a hundred. Underground pipes need protection from collapse in sandy soil, so we use rigid pipe and bury it deep enough to avoid vehicle traffic.
Fahad Al-Ahmad lies in Ahmadi governorate, a residential zone of isolated plots with wide spacing between houses.
Every sewer section is tested with continuous water flow, and pipes are inspected by internal camera to confirm no blockages or cracks remain.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a laser level to measure actual height from the first fixture to the inspection chamber. If the floor is perfectly flat, we raise the entry point slightly or lower the boundary chamber to achieve the required gradient.
Yes, sandy soil cannot support thin pipes. We use rigid PVC pipe of specified gauge with compacted sand bedding above and below. Deep burial protects against trench wall collapse.
