Network route planning
Drain routes mapped against the site plan and building layout

Mubarak Al-Kabeer
Sewer network installation in Funaitees requires mapping routes from residential and commercial buildings to the boundary chamber. We determine start and end levels and excavate trenches to correct depth. Pipes are laid and tested with running water before final backfill.
Funaitees has multi-storey residential buildings and shops, and drainage from upper and lower floors needs pipes of different sizes. We start by collecting drain from the top floor and run it down to meet waste from ground floor. Main pipes under the street are wider and deeper to collect all building drainage. We inspect every joint to ensure no water leaks into surrounding soil.
Funaitees sits in Mubarak Al-Kabeer governorate, an urban area with multi-storey buildings and commercial activity.
Before backfill, we gently blow compressed air through each branch to check for blockages or debris inside the pipes.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Drainage from upper floors descends through narrow vertical pipes and meets ground-floor waste in a wider horizontal pipe. The shift from vertical to horizontal happens at an inspection point to avoid blockages.
Yes, we lay pipes at least one metre below street level. Above the pipes we place gravel and sand to specified thickness before resurfacing the street.