Network route planning
Drain routes mapped against the site plan and building layout

Mubarak Al-Kabeer
A properly buried sewer network in Sabhan Industrial serves warehouses and factories with long lines from discharge points to the boundary chamber. We size pipes to expected flow, grade lines at the required fall, and test with full-flow pumping before site handover.
Factories and warehouses in Sabhan Industrial are large buildings with thick concrete floors, and main discharge points usually sit near water inlets or far corners away from the main road. We map the network to avoid building foundations and existing buried pipes. Where the sewer crosses stormwater or water pipes we check vertical and horizontal clearances and document them to prevent breakage.
Sabhan Industrial sits in Mubarak Al-Kabeer governorate, a zone of factories and warehouses where networks need precise planning to avoid crossings.
We test the network by pumping water at a rate matching expected daily flow to catch any fall deficiency or potential blockages.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We request a site plan showing all existing pipes and foundations. We route the sewer network on a different path or run it beneath with a safe vertical clearance of at least 60 cm.
Diameters are determined by expected daily discharge rate, not cost. Using undersized pipes increases velocity and causes future blockages. We select the correct diameter based on engineering calculation.