Network route planning
Drain routes mapped against the site plan and building layout

Farwaniya
Installing a buried sewer network in Khitan Al-Jadida starts by mapping pipe routes from every fixture to the boundary chamber. We establish the lowest point of the network and check continuous fall between joints. Every section is tested with water and air before burial.
Khitan Al-Jadida consists mainly of new villas on separate plots, and each villa needs its own network from ground and upper floor bathrooms to kitchen outlets. We draw a main line with steady fall from the furthest fixture to the boundary chamber, using junction bends at sharp turns. The soil here is sandy, so we need even excavation depth and proper pipe bedding before backfill.
Khitan Al-Jadida lies in Farwaniya governorate, a new residential zone where networks are laid during initial construction.
We test network fall using a clear pipe filled with coloured water to see flow movement from first fixture to boundary chamber.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a water level and measuring tape from each fixture point to the boundary chamber, recording height every metre. Required fall is roughly one centimetre per metre, and any less causes stagnation.
We use a junction bend instead of bending the pipe directly, because a curve slows water and debris flow. Each junction can be inspected from above after burial if needed.