Network route planning
Drain routes mapped against the site plan and building layout

Ahmadi
In Maqwa, a buried sewer network must account for hard ground and nearby industrial areas. We map the network along natural ground slopes, excavate at consistent depth, install pipes and run full commissioning tests before final closure.
Maqwa sits near oil fields and companies, where ground is hard to cut and full of stone and gravel. We use specialist diggers to open trenches and install high-grade sewer pipes that resist ground pressure. We bed each trench with fine sand and support pipes on small concrete blocks to prevent settling. We water-test every joint before backfilling with gravel and soil.
Maqwa is an area in Ahmadi governorate where ground is hard and drainage must be strong and pressure-resistant.
We check every pipe joint under steady water pressure before backfilling because stony ground can cause minor pipe movement.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we lay a bed of fine sand below and above the pipe before gravel. This layer protects from stone impact and sharp edges and distributes ground pressure evenly.
Yes, trenches may take longer because diggers need more power and frequent stops to break large stones. We notify you of expected delays when we start work.