Network route planning
Drain routes mapped against the site plan and building layout

Hawalli
Sewer network installation in Nuqra links residential buildings and shops to one main line running under the main street toward the boundary chamber. We trench deeply under the road and lay larger-diameter pipes to collect drainage from many floors. The network is tested by pumping water from the highest point and observing smooth flow.
Nuqra has residential buildings and ground-floor shops, and wastewater from bathrooms and kitchens collects in a trench under the street before reaching the main line. We place inspection chambers at each junction, bend and pipe diameter change for easy cleaning and maintenance. We ensure sufficient depth below foundations and neighbouring old basements.
Nuqra sits in Hawalli near Salmiya, a mixed building area with ground-floor commerce requiring a reliable drainage network under the street.
Each inspection chamber is filled and sealed for one hour to check for water level drop from slow leakage.
Drain routes mapped against the site plan and building layout
Pipes set at calculated gradients on compacted sand bedding to prevent sagging
Chambers built at every change of direction for future maintenance access
Network pressure-tested before backfilling to confirm all joints are sealed
In-line filming reveals any deflection or cracked joint before trench closure
Drain networks for new construction and building extensions to the same standard
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We obtain foundation maps from the municipality before starting and plan the route to avoid columns and load-bearing walls. If we must work near an old foundation we dig carefully by hand and use flexible pipes where possible.
Inspection chambers open easily and can be cleaned from inside with a pump or spiral machine. We leave clear instructions for locating each chamber and opening its cover safely.
